Checkatrade puts most whole-roof replacements between £4,000 and £19,000 (VAT not stated), with scaffold and stripping often priced as extras. A full re-cover counts as notifiable building work, so either your roofer self-certifies it through an approved scheme, or it goes through Leeds City Council's building control, whose full plans fee table includes a category for "renovation of a thermal element to a single dwelling" at £325 including VAT.
What makes up the price of a new roof?
| Part of the job | From | To | Published by |
|---|---|---|---|
| Three-bed house, tiled, all in | £8,400 | £25,200 | Which? (2026-10-22) |
| Most re-roofs reported | £4,000 | £19,000 | Checkatrade (2025-06-30) |
| Gable-ended house | £8,400 | £19,500 | Checkatrade (2025-06-30) |
| Hipped roof (four slopes) | £11,100 | £21,600 | Checkatrade (2025-06-30) |
| Scaffold for the job | £700 | £1,300 | Checkatrade (2025-06-30) |
| Old roof stripped and taken away | £1,000 | £2,500 | Checkatrade (2025-06-30) |
Which?'s figures and Checkatrade's gable and hipped figures were published excluding VAT, so we've added 20%. Checkatrade's typical range, scaffold and stripping figures don't say, so they're shown as published.
Why the big spread? Roof area and shape matter most. A hipped roof has more cutting and more hip tiles than a simple gable. Material matters next: natural slate and clay tiles cost far more than concrete. Then there's access, chimneys, dormers and valleys, each of which adds labour. A small terraced roof in Bramley and a large detached roof in Roundhay are different jobs.
How do you know it's time to replace the roof?
Signs that point towards replacement rather than another patch:
- you've had several leaks in different places within a year or two;
- tiles are flaking, porous or slipping across large areas;
- the felt in the loft is torn or crumbling, or there's no underlay at all;
- the roof line sags between rafters;
- the roof is due for scaffold anyway, for solar panels, a loft conversion or chimney work.
Ask any roofer recommending replacement to show you photos of the problems. If you're unsure, a second opinion on a five-figure job is completely reasonable.
What does a re-roof involve, step by step?
- Survey and measure, including a look at the timbers from inside the loft.
- Written specification and price: tiles, underlay, battens, ridge system, scaffold, skip, building control, guarantee and payment stages.
- Approval: the roofer registers it with their competent person scheme, or a building notice or full plans application goes to Leeds City Council.
- Scaffold goes up, often a day or two ahead.
- Strip and rebuild: old covering off, new underlay, battens and tiles on, ridge, verges and flashings finished.
- Completion: certificate or confirmation of registration, plus a written guarantee.
Do you have to clear the loft for a new roof?
Not usually all of it, but expect dust and bits of old felt to fall in while the roof is stripped. Cover or move anything precious, particularly near the eaves, and ask whether the roofer lays protective sheets. It's one of the most common questions people ask Google about new roofs, and it's worth settling before the scaffold arrives.
How long will the work take?
On an average semi, the roofing itself often takes about a week of dry weather, plus scaffolding time. Ask how the house will be kept watertight if rain arrives mid-job, and what happens if the forecast turns.
Leeds building control and conservation areas
Leeds City Council offers three routes. Full plans is for any building work. A building notice suits minor works not yet started, but can't be used for flats or for work over or near a public sewer. Regularisation covers work already done without approval. Fees come from the council's published tables, with and without VAT; the council emails an application number and asks for payment within 28 days.
Leeds also has 80 conservation areas. Within them, alterations such as dormers, some chimney work, flues and some solar installations can need planning consent, and like-for-like materials are generally expected on visible roofs. Details and links are in our Leeds building rules guide.
Is it worth adding insulation or ventilation during a re-roof?
Usually, yes. With the roof open and scaffold up, improving loft insulation and making sure the roof space is ventilated costs far less than doing it later. Building regulations generally expect a re-covered roof's thermal performance to be improved where practical. Ask your roofer what they propose, and whether a breathable underlay and eaves or ridge ventilation are included in the price.
Will a new roof add value to your home?
A new roof rarely adds its full cost to a sale price, but an old, leaking roof can knock value off or put buyers off altogether. A recent re-roof with a certificate and a transferable guarantee is a strong point in a sale, particularly on older Leeds terraces where surveyors look closely at roofs.
Before you sign a re-roofing contract
- Fixed price or estimate? Is VAT in or out?
- Are scaffold, skip and building control included?
- How will rotten timber be found, shown to you and charged?
- Which underlay, battens and tiles are being used?
- Who is registering the work, and through which scheme?
- How long is the guarantee, and is it insurance-backed?
- What is the payment schedule?
Our hiring guide explains why each of these matters.