GritstoneRoofing in Sheffield Get a quote
Two roofers fixing new tiles over battens and breathable membrane

New roofs and re-roofing in Sheffield

A new tiled roof on a typical three-bedroom house costs £8,400 to £25,200 including VAT, based on a Which? survey of 11 roofing traders.

3-bed re-roof £8,400 to £25,200Building control handled

Get a written quote

Updated 2026-11-21. Prices link to their published source.

Typical prices

  • New tiled roof, 3-bed houseWhich?, inc. VAT (our calc)£8,400 to £25,200
  • Gable roof replacementCheckatrade, inc. VAT (our calc)£8,400 to £19,500
  • Hipped roof replacementCheckatrade, inc. VAT (our calc)£11,100 to £21,600
  • Scaffolding for a re-roofCheckatrade, VAT not stated£700 to £1,300
Work out your own range

Checkatrade reports that most whole-roof jobs cost between £4,000 and £19,000, without saying whether VAT is included. The spread is wide because size, shape, material and access all vary. In Sheffield, replacing a whole roof covering is notifiable building work, so your roofer either self-certifies it through a registered scheme or someone applies to building control. Budget for scaffolding, stripping the old roof and waste on top of the tiles themselves unless the quote says they're included.

How much does a new roof cost?

We've converted every figure to include VAT where the source quoted it without, so you can compare like with like. Treat these as a sense-check, not a quote.

JobTypical priceVATSource
New tiled roof, 3-bed house£8,400 to £25,200inc. VAT (our calc)Which?, 2026-10-22
Roof replacement, most jobs£4,000 to £19,000VAT not statedCheckatrade, 2025-06-30
Gable roof replacement£8,400 to £19,500inc. VAT (our calc)Checkatrade, 2025-06-30
Hipped roof replacement£11,100 to £21,600inc. VAT (our calc)Checkatrade, 2025-06-30
Scaffolding for a re-roof£700 to £1,300VAT not statedCheckatrade, 2025-06-30
Stripping and disposing of the old roof£1,000 to £2,500VAT not statedCheckatrade, 2025-06-30

A hipped roof, which slopes on all four sides, usually costs more than a gable roof of the same size because there are more cuts, more hip tiles and more labour. Natural slate costs more than concrete tiles. Large detached houses on the western side of the city, with dormers, valleys and several chimneys, will sit at the top of these ranges or above them.

Labelled diagram of a pitched roof showing the ridge, tiles on battens, underlay, chimney, fascia, gutter and soffit
What gets replaced in a full re-roof: tiles, battens and underlay, and often the ridge, fascias and flashings.

When do you need a new roof rather than a repair?

Repairs keep a sound roof going. A new roof becomes the better spend when several of these are true:

  • Leaks keep returning in different places even after repairs.
  • Lots of tiles are cracked, flaking or slipping, not just one or two.
  • The underlay in the loft is torn, brittle or missing, which is common on older roofs.
  • Battens are rotten, or the roof line has started to dip between rafters.
  • You're paying for scaffold anyway, for example for a loft conversion or solar panels.

A good roofer will show you the evidence, ideally with photos from the roof, rather than simply telling you it's past saving. If you're not sure, get a second opinion. That's normal for a job of this size.

What happens during a re-roof?

  1. Survey. The roofer measures the roof, checks the timbers from the loft and asks about access.
  2. Written quote. This should list materials by name, underlay type, scaffold, waste removal, building control, guarantee length and the payment schedule.
  3. Notification. The roofer registers the work with their competent person scheme, or a Building Notice or Full Plans application goes to Sheffield City Council. See our building regulations guide.
  4. Scaffold. Usually up a day or two before the roofers start.
  5. Strip and re-cover. Old tiles, battens and underlay come off. New underlay, battens and tiles go on, plus ridge, verges and flashings.
  6. Sign-off. You should receive a completion certificate or confirmation that the work was registered, and the written guarantee.
Diagram of seven stages in a roofing job from enquiry to sign-off
The stages of a re-roof. The approval and sign-off steps matter: keep the paperwork for when you sell.

How long does a new roof take?

The roofing itself on a typical semi often takes around a week, but weather can stretch that. Add time for scaffolding and any approvals. Ask the roofer how they keep the house watertight overnight and if rain is forecast while the roof is stripped.

Do you need to empty your loft?

This question comes up in almost every search for a new roof. You usually don't need to empty it completely, but dust and debris will fall through as the old underlay comes off. Cover or move anything you care about, and ask the roofer whether they'll put protective sheeting down. Boarded lofts used for storage are worth clearing near the eaves where the roofers will be working.

Building control and conservation areas in Sheffield

The government's guidance on home repairs lists replacing roof coverings as work that must be notified to building control. Roofers registered with a competent person scheme can certify it themselves. If yours isn't, the council route applies: Sheffield's Building Notice needs at least two working days' notice before work starts and is valid for three years.

If you live in one of Sheffield's 38 conservation areas, check whether you need like-for-like materials. In Nether Edge and Broomhill, Article 4 directions add controls on some changes to roof slopes that face a road. Three conservation areas in the north-west, around Bradfield and Upper Midhope, are administered by the Peak District National Park Authority. Our building regulations page links to the council sources.

Questions to ask before you sign

  • Is the price fixed, and does it include VAT, scaffold, skip and building control?
  • What happens if you find rotten timbers, and how will that be priced?
  • Which underlay and tiles are you using?
  • Will you register the work with a competent person scheme, or should I apply to the council?
  • What guarantee do I get, and is it insurance-backed?
  • What's the payment schedule? Avoid paying the full amount up front.

Our guide to choosing a roofer covers the checks in more detail.

Get the roof looked at properly

Five short questions, then a Sheffield roofer calls you back to arrange a look. The quote comes in writing, and it's yours to keep whatever you decide.

Prices Get a quote